期刊文献+

抵港时间不确定的多目标泊位-岸桥分配 被引量:2

Continuous berth and quay crane allocation with stochastic arrival time
下载PDF
导出
摘要 针对不确定性因素造成的船舶提前或延迟到港的问题,考虑船舶抵港时间不确定性,建立以船舶在港时间和港口装卸成本最小化为目标的泊位-岸桥分配非线性混合整数多目标规划模型,利用优化技术处理非线性多目标问题.研究结果表明:模型能有效减少船舶抵港时间不确定性对港口运营造成的损失,优化船舶装卸操作成本和船舶在港作业时间,为集装箱码头提供了更合理的解决方案. In response to vessels' early or delay problem caused by uncertainties, considering berth and quay crane allocation with stochastic arrival time, a multi-objective and nonlinear mixed integer programming model is established to minimize the turnaround of vessels and handling cost of the port. And the optimization techniques are used to deal with this problem. As a result, the examples show that the model can reduce the loss of port operations caused by stochastic arrival time, the operating costs and loading and unloading time effectively, providing a more reasonable solution for the container terminal.
作者 王冬越 杨斌
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2015年第1期135-140,共6页 Journal of Liaoning Technical University (Natural Science)
基金 国家自然科学基金资助项目(71171129) 上海市科委科研计划基金资助项目(12510501600 11510501900 12dz1124802)
关键词 泊位-岸桥分配 抵港时间不确定 非线性优化 混合整数多目标规划 集装箱码头 berth and quay crane allocation stochastic arrival time nonlinear optimization mixed-integer multi-objective programming container terminal
  • 相关文献

参考文献11

二级参考文献66

  • 1韩晓龙,丁以中.集装箱港口泊位配置优化[J].系统工程理论方法应用,2006,15(3):275-278. 被引量:22
  • 2孟参,王长琼.应急物流系统运作流程分析及其管理[J].物流技术,2006,25(9):15-17. 被引量:40
  • 3Frank Meisel,Christian Bierwirth. Heuristics for the integration of crane productivity in the berth allocation problcm[J].Transportation Research Part E,2009(45): 196-209. 被引量:1
  • 4Tavakko L I,Moghaddam R, Makui A, et al. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports[J].Computers & Industrial Engineering,2009(56):241-248. 被引量:1
  • 5Akio Imai, Hsieh Chia Chon, Etsuko Nishimura,,et al.The simultaneous berth and quay crane allocation problem[J]. Transportation Research Part E,2008(44):900-920. 被引量:1
  • 6Kap Hwan Kim, Young Man Park.A scheduling method for Berth and Quay cranes[J].OR Spectrum, 2003 (25): 1-23. 被引量:1
  • 7Lee Derhomg,Wang Huiqiu.Integrated discrete berth allocation and quay crane scheduling in port container terminals[J].Engineering Optimization, 2010,42(8):747-761. 被引量:1
  • 8Liang Chengji, Huamg Youfang, Yang Yang.A quay cranc dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning[J].Computers & Industrial Engineering, 2009 (56): 1 021-1 028. 被引量:1
  • 9Dirk Steenken, Stefan VoB, Robert Stahlbock, Coatainer terminal operation and operations research-a classification and literature review[J]. OR Spectrum, 2004, 26(1): 3-49. 被引量:1
  • 10Frank Meisel, Christian Bierwirth.A survey of berth allocation and quay crane scheduling problems in container terminals[J].European Journal of Operational Research, 2010 (202):615-627. 被引量:1

共引文献31

同被引文献15

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部