期刊文献+

隧道机械化清筛作业洒水降尘试验研究 被引量:4

Experimental study on water spraying dust during mechanical ballast cleaning in tunnel
下载PDF
导出
摘要 由于既有铁路隧道空间有限、空气流动不畅,导致铁路隧道有砟轨道道床在进行清筛作业时施工环境粉尘大、能见度低,严重危害施工人员的身体健康,并影响施工质量和作业效率。鉴于此,以煤粉作为道砟污土进行饱和吸水率试验和筛分试验,探讨清筛作业时合理的洒水量和洒水时间。结果表明:洒水量取道床中所含煤粉质量的15%较为合适;为保证水分能被煤粉充分吸收且不因洒水提前时间过长造成水分大量蒸发,提前1 d洒水抑制粉尘及清筛的效果最好。 Limited space and poor air flowof existing railway tunnels often lead to large amounts of environmental dust and lowvisibility during mechanical cleaning operation of railway tunnel ballast track bed,which damages the health of construction personnel and affects construction quality and work efficiency.By taking the coal as ballast polluted soil,the saturated absorption test and sieving test were made,and the reasonable amounts of watering and spraying scheme were discussed.The results showed that the watering amount should be 15% of coal quality in ballast bed,the effect of dustfall by spraying and mechanical cleaning before 1 d is best,which ensures that water can be fully absorbed by coal and a large number of water evaporation caused by long preset time of spraying should be avoided.
出处 《铁道建筑》 北大核心 2015年第1期48-50,共3页 Railway Engineering
基金 中国铁路总公司科技研究开发计划项目(2013G007-B)
关键词 有砟轨道 机械化清筛 降尘 洒水 Ballast track Mechanical cleaning Dstfall Water spraying
  • 相关文献

参考文献10

二级参考文献39

共引文献60

同被引文献24

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部