摘要
高墩大跨桥梁混凝土泵送施工要求比较高。笔者结合多年工作经验,对高墩大跨桥梁强混凝土泵送施工做了简要分析。
The requirements for the concrete pumping construction of large-span bridge with high-pier are relatively high. Combined with many years of work experience, the author does a brief analysis on the high strength concrete pumping construction of large-span bridge with high-pier.
出处
《价值工程》
2015年第3期118-119,共2页
Value Engineering
关键词
高墩大跨桥梁
强混凝土泵送施工
工程概况
施工工艺
large-span bridge with high-pier
high strength concrete pumping
project overview
construction technology