期刊文献+

西藏会展中心管桁架钢结构屋盖施工技术 被引量:9

Steel Tube Truss Structure Roof Construction of Tibet Convention and Exhibition Center
下载PDF
导出
摘要 西藏会展中心工程地处高海拔、低含氧量的拉萨地区,由于屋盖空间形状复杂,高度、跨度大及杆件数量较多,采用常规的安装方法都不理想。通过比选,提出了屋盖外围部分采用组合单元吊装,屋盖内部部分采用整体提升技术。此方法有效地降低了高空作业量,提高了施工效率,工程实践证明提出的施工技术具有充分的安全性和明显的经济性。 Tibet Convention and Exhibition Center project, due to its location of high altitude, low oxygenlevels in the Lhasa area, and the complexity of roof shape, height, large span and lots of pipes, isdifficult for the conventional construction methods. Through comparison, a construction plan of the outerpart of the roof lifting by combining unit, the internal part of roof by integral lifting technology isestablished. This method reduces the high operation effectively, improves the efficiency of theconstruction, the finally construction result shows that the proposed construction technology is withsufficient safety and obvious advantage in economy.
出处 《施工技术》 CAS 北大核心 2014年第20期29-32,共4页 Construction Technology
基金 国家自然科学基金青年基金(51108210) 江苏省博士后基金(1301048C)
关键词 钢结构 管桁架 液压同步提升 温差 施工技术 steel structures tube truss hydraulicdifference constructionsynchronizing lifting temperature
  • 相关文献

参考文献6

二级参考文献15

共引文献140

同被引文献48

引证文献9

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部