期刊文献+

带驻留约束的双臂集束型设备群的调度方法 被引量:5

Scheduling method for dual-blade multi-cluster tools with residency constraints
下载PDF
导出
摘要 为提高集束型设备群的生产效率,在考虑加工不同种类晶圆条件下,研究带驻留约束的双臂集束型设备群的建模与调度问题.提出虚拟缓冲模块概念,引入时间区间集来描述系统的运行状态,并以此建立调度问题的非线性规划模型;结合数学模型,提出一种以时间区间集为核心的基于虚拟缓冲模块概念和交换策略的调度算法;对所提出的算法进行了仿真分析.结果表明:所构建的算法运行时间短,调度1个Lot数量的晶圆仅仅需要0.5 s左右,响应时间快;与研究问题域的下界比较,算法的结果接近下界;当设备因子大于5时,周期延长率R已经全部小于0.05,取得了较好的调度效果,表明算法是可行且有效的. To improve the production efficiency of multi-cluster tools, modeling and scheduling problems of dual-blade multi-cluster tools with residency constraints and multi-type wafers were researched. Firstly, based on the proposed conception of virtual buffer modules, time interval sets were introduced to characterize the running states of the system. Then a non-linear mathematical model of the problems was formulated, and a scheduling algorithm was presented based on the conception of virtual buffer modules and the swap scheduling strategy. Finally, experiments were carried out to evaluate the proposed algorithm. Results indicated that, when scheduling a lot wafers, the running time of the constructed algorithm is only about 0.5 seconds, and the response time of the algorithm is also quick. Comparing a lower bound of' the research problem domain, solutions are close to the lower bound. When the device factor is greater than 5, the cycle elongation R is less than 0. 05. The algorithm achieves good results.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2014年第1期83-89,共7页 Journal of Harbin Institute of Technology
基金 国家自然科学基金资助项目(71071115 61273035)
关键词 集束型设备群 双臂机械手 驻留约束 时间区间集 调度 multi-cluster tools dual-blade robot residency constraints time interval set scheduling
  • 相关文献

参考文献3

二级参考文献26

  • 1Perkinson T L,McLarty P K,Gyurcsik R S,Cavin R K.Single-wafer cluster tool performance:an analysis of throughput.IEEE Transactions on Semiconductor Manufac-turing,1994,7(3):369-373. 被引量:1
  • 2Venkatesh S,Davenport R,Foxhoven P,Nulman J.A steady-state throughput analysis of cluster tools:dual-blade versus single- blade robots.IEEE Transactions on Semiconductor Manufacturing,1997,10(4):418-424. 被引量:1
  • 3Rostami S,Hamidzadeh B.Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints.IEEE Transactions on Semiconductor Manufacturing,2002,15(3):341-349. 被引量:1
  • 4Rostami S,Hamidzadeh B.An optimal residency-aware scheduling technique for cluster tools with buffer module.IEEE Transactions on Semiconductor Manufacturing,2004,17(1):68-73. 被引量:1
  • 5Yoon H J,Lee D Y.Online scheduling of integrated single-wafer processing tools with temporal constraints.IEEE Transactions on Semiconductor Manufacturing,2005,18(3):390-398. 被引量:1
  • 6Ding S,Yi J,Zhang M T.Multicluster tools scheduling:an integrated event graph and network model approach.IEEE Transactions on Semiconductor Manufacturing,2006,19(3):339-351. 被引量:1
  • 7Yi J,Ding S,Song D,Zhang M T.Steady-state throughput and scheduling analysis of multi-cluster tools:a decompo-sition approach.IEEE Transactions on Automation Science and Engineering,2008,5(2):321-336. 被引量:1
  • 8Chan W K,Yi J,Ding S.On the optimality of one-unit cycle scheduling of multi-cluster tools with single-blade robots.In:Proceedings of the IEEE Conference on Automation Science and Engineering.Scottsdale,USA:IEEE,2007.392-397. 被引量:1
  • 9Chan W K,Yi J,Ding S,Song D.Optimal scheduling of k-unit production of cluster tools with single-blade robots.In:Proceedings of the IEEE International Conference on Au-tomation Science and Engineering.Arlington,USA:IEEE,2008.335-340. 被引量:1
  • 10Wu N,Chu C,Chu F,Zhou M C.Modeling and schedulabil-ity analysis of single-arm cluster tools with wafer residency time constraints using Petri net.In:Proceedings of the IEEE International Conference on Networking,Sensing and Con- trol.Sanya,China:IEEE,2008.84-89. 被引量:1

共引文献15

同被引文献42

  • 1YI J, DING S, S()NG D, et al. Scheduling analysis of cluster tools with buffer/process modules[C]// 2007 IEEE International Conference on Robotics and Automation. Roma, Italy: IEEE, 2007: 985-990. 被引量:1
  • 2WU N Q, CHU C B, CHU F, etal. Modeling and schedulability analysis of single-arm cluster tools with wafer residency time constraints using Petri net[C]// 2008 IEEE International Conference on Networking, Sensing and Control. Sanya, China: IEEE, 2008: 84- 89. 被引量:1
  • 3KIM D K, LEE T E, KIM H J. Optimal scheduling of transient cycles for single armed cluster tools[C]// 2013 IEEE International Conference on Automation Science and Engineering. Madison, WI, USA: IEEE, 2013:874 879. 被引量:1
  • 4JUNG C, LEE T E. An efficient mixed integer pro gramming model based on timed Petri nets for diverse complex cluster tool scheduling problems[J]. IEEE Transaction on Semiconductor Manufacturing, 2012, 25(2) : 186-199. 被引量:1
  • 5VENKATESH S, DAVENPORT R, FOXHOVEN P, et al. A steady state throughput analysis of clus- ter tools: Dual-blade versus single blade robots [J]. IEEE Transactions on Semiconductor Manufacturing, 1997, 10(4): 418-424. 被引量:1
  • 6KIM J H, LEE T E, LEE H Y, et al. Scheduling analysis of time-constrained dual-armed cluster tools [J]. IEEE Transactions on Semiconductor Manufac- turing, 2003, 16(3): 521 534. 被引量:1
  • 7ROSTAMI S, HAMIDZADEH B, CAMPORESE D. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints [J]. 1EEE Transactions on Robotics and Automation, 2001, 17 (5) : 609-618. 被引量:1
  • 8PERKINSON T L, GYURCSIK R S, MCLARTY P K. Single-wafer cluster tool performance: An analy sis of the effects of redundant chambers and revlsitat[ on sequences on throughput[J]. IEEE Transactions on Semiconductor Manufacturing, 1996, 9(3): 384 400. 被引量:1
  • 9PAEK J H, LEE T E. Optimal scheduling of dual- armed cluster tools without swap restriction[C]// 2008 IEEE International Conference on Automation Science and Engineering. Arlington, VA, USA: IEEE, 2008: 103-108. 被引量:1
  • 10YAN Q, WU N Q, ZHOU M C, et al. Petri net- based scheduling analysis of dual arm cluster tools subject to wa{er revisiting and residency time con-straints[C] // 2013 IEEE 10th International Confer- ence on Networking, Sensing and Control. Evry, France: IEEE, 2013: 252-257. 被引量:1

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部