分布式多工厂单件制造企业提前/拖期生产计划研究 被引量:11

Earliness and Tardiness Production Planning with Due-Date for Multi-Location OKP Manufacturing Systems
下载PDF
导出
摘要 描述了分布式多工厂单件制造企业交货期下的提前 /拖期生产计划 ,以实现最小化提前 /拖期惩罚费用、生产成本以及产品运输费用之和为目标 ,建立了 0 - 1规划数学模型 ,利用分枝定界算法得到了生产计划调度方案。计算结果证明了模型的有效性。 Earliness and tardiness production planning with due-date for multi-location OKP manufacturing systems is studied and a linear 0-1 programming model proposed. The objective is to find an optimal scheduling and to minimize the total sum of earliness and tardiness penalties, production costs and transport costs. The optimal production planning scheme can be obtained by using the Branch and Bound algorithm. The results show that the algorithm model has a good validity and potential to practical production applications.
出处 《计算机集成制造系统-CIMS》 EI CSCD 2000年第5期52-57,共6页
基金 国家自然科学基金资助项目 !(6 96 840 0 5 ) 国家 86 3 /CIMS主题资助项目!(86 3 -5 11-9844-0 11)
关键词 分布式多工厂 生产计划 单件制造企业 multi-location planning due-date earliness and tardiness production planning OKP JIT production ERP
  • 相关文献

参考文献1

二级参考文献5

共引文献9

同被引文献113

引证文献11

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部