摘要
描述了基于模糊交货期分布式多工厂单件制造业生产计划 ,建立具有不同类型模糊交货期的生产计划模型 ,提出适合于分布式多工厂单件制造业生产计划的算法。计算结果表明模型的有效性。
Production planning with fuzzy due date for multi location OKP manufacturing systems is studied, two kinds of models with different type of fuzzy due date are proposed to control JIT production. The optimal production planning results can be obtained by the algorithm developed in the article. The results show that it can obtain a satisfactory solution and have potential applied to practical production applications.
出处
《系统工程理论方法应用》
2000年第3期229-234,共6页
Systems Engineering Theory·Methodology·Applications
基金
国家自然科学基金!(6 96 840 0 5 )
86 3计划CIMS主题!(86 3 5 11 9844 0 11)资助课题
关键词
分布式计划
模糊交货期
生产计划
单件制造业
multi location planning fuzzy due date membership function JIT production OKP supply chain