4Patrick Decorla-Souza. Total cost analysis: an alternative to benefit-cost analysis in evaluating transportation alternatives [J]. Transportation,1997,24:107-123. 被引量:1
6Pekka Leviakangas, Jukka Lahesmaa. Profitability evaluation of intelligent transport system investments [J]. Journal of Transportation Engineering, 2002, (6):276-286. 被引量:1