3Toda,Hiromichi,Yamanaka.Planning and operation performance of600 MW coal and oil dual-fired boiler for a supercritical sliding pressure operation[J].Technical Review-Mitsubishi Heavy Industries,1985,22(3):225-233. 被引量:1
5Naimanov O S.Features of the selection of initial steam pressure of geothermal power stations with one and two evaporation stages[J].Thermal Engineering,1986,33(2):79-82. 被引量:1
6Aminov R Chertykov.Choice of optimal stage of initial steam pressure in heat-generating power units[J].Tyazheloe Mashinostroenie,1992,35(8):18-19. 被引量:1
7Zhang Chunfa.A steam-water distribution matrix equation of the whole thermal system[C].In:S.R.Pen-filed 1999 Intemational Joint Generation Conference,U.S.A.ASMEPower,1999. 被引量:1