摘要
通过对丰城电厂 1号汽轮发电机组变压运行优化试验结果的分析 。
This paper is found out optimizing control operation mode under differ load the set, through analysis of No.1 turbine generator units transformer operating optimization test for Fengcheng power plant.
出处
《江西电力》
2002年第2期1-3,25,共4页
Jiangxi Electric Power