期刊文献+

A Worst-Case Execution Time Analysis Approach Based on Independent Paths for ARM Programs

A Worst-Case Execution Time Analysis Approach Based on Independent Paths for ARM Programs
原文传递
导出
摘要 To overcome disadvantages of traditional worst-case execution time (WCET) analysis approaches, we propose a new WCET analysis approach based on independent paths for ARM programs. Based on the results of program flow analysis, it reduces and partitions the control flow graph of the program and obtains a directed graph. Using linear combinations of independent paths of the directed graph, a set of feasible paths can be generated that gives complete coverage in terms of the program paths considered. Their timing measurements and execution counts of program segments are derived from a limited number of measurements of an instrumented version of the program. After the timing measurement of the feasible paths are linearly expressed by the execution times of program seg-ments, a system of equations is derived as a constraint problem, from which we can obtain the execution times of program segments. By assigning the execution times of program segments to weights of edges in the directed graph, the WCET estimate can be calculated on the basis of graph-theoretical techniques. Comparing our WCET estimate with the WCET measurement obtained by the exhaustive measurement, the maximum error ratio is only 8.259 3 %. It is shown that the proposed approach is an effective way to obtain the safe and tight WCET estimate for ARM programs. To overcome disadvantages of traditional worst-case execution time (WCET) analysis approaches, we propose a new WCET analysis approach based on independent paths for ARM programs. Based on the results of program flow analysis, it reduces and partitions the control flow graph of the program and obtains a directed graph. Using linear combinations of independent paths of the directed graph, a set of feasible paths can be generated that gives complete coverage in terms of the program paths considered. Their timing measurements and execution counts of program segments are derived from a limited number of measurements of an instrumented version of the program. After the timing measurement of the feasible paths are linearly expressed by the execution times of program seg-ments, a system of equations is derived as a constraint problem, from which we can obtain the execution times of program segments. By assigning the execution times of program segments to weights of edges in the directed graph, the WCET estimate can be calculated on the basis of graph-theoretical techniques. Comparing our WCET estimate with the WCET measurement obtained by the exhaustive measurement, the maximum error ratio is only 8.259 3 %. It is shown that the proposed approach is an effective way to obtain the safe and tight WCET estimate for ARM programs.
出处 《Wuhan University Journal of Natural Sciences》 CAS 2012年第5期391-399,共9页 武汉大学学报(自然科学英文版)
基金 Supported by the National High Technology Research and Development Program of China(863 Program,2009AA011705) the National Natural Science Foundation of China(60903033)
关键词 worst-case execution time independent path realtime system least squares ARM microprocessor worst-case execution time independent path realtime system least squares ARM microprocessor
  • 相关文献

参考文献2

二级参考文献26

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部