期刊文献+

柳州南编组站综合自动化系统初步设计方案 被引量:3

Preliminary Design Scheme of Integrated Automation System for South Liuzhou Marshalling Station
下载PDF
导出
摘要 编组站综合自动化系统SAM在西安局新丰镇编组站成功运用了4年,目前正准备在南宁铁路局柳州南编组站规划设计实施应用。介绍南宁铁路局柳州南编组站现状和编组站综合自动化(SAM)设计思路,以及柳州南编组站(SAM)系统初步设计方案。 A Synthetic Automation of Marshalling, for short, SAM, has been used successfully for 4 years at Xinfengzhen marshalling station in Xi 'an railway administration. Now another SAM system is planned to design and set up at the South Liuzhou We describes the current status and the design ideas of SAM as marshallin' station. of South Liuzhou marshalling marshalling well as the preliminary design station in Nanning railway administration. station in Nanning Railway Administration plan of the SAM system for South Liuzhou marshalling station.
出处 《铁道通信信号》 2012年第9期20-22,共3页 Railway Signalling & Communication
关键词 编组站 自动化 设计 Marshalling station Automation Design
  • 相关文献

参考文献2

二级参考文献5

共引文献19

同被引文献14

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部