期刊文献+

面向船体分段建造的二维不规则空间调度方法 被引量:6

Two-Dimensional Irregular Spatial Scheduling Method for Hull Block Construction in Shipbuilding
下载PDF
导出
摘要 针对船体分段建造计划的时空特性和分段投影不规则形状的特点,提出了综合时间和空间的多目标分段建造空间调度优化模型.该模型将船体分段投影抽象为更接近实际形状的不规则多边形,提出分段调度中的悬挂和重叠现象的检验方法和解决方案.设计了具有时空特性的改进粒子群算法,采用均值自适应加权法解决多目标权值分配问题,使目标函数值比例均衡.最后,以船厂实际数据为例进行实验验证.结果表明,所提出的调度方法能有效地提高船舶分段生产效率和空间利用率,并具有较强实用性. Considering spatiotemporal feature of spatial scheduling in block construction and irregular pro- jection shape of blocks, an optimization model which takes time and space as the optimization objectives was proposed. In order to approach actual situation, blocks are thought as irregular polygons. Interference checking and suspension test are used to avoid the phenomenon of suspension and overlap in spatial schedu- ling. An improved particle swarm optimization method was designed and average adaptive approach was used to determine weights for different optimal goal in the spatial scheduling algorithm. The simulation re- sults validate the effectiveness of the proposed approach, showing that this algorithm can improve the spa- tial utilization and reduce the complete processing time effectively.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2012年第4期651-656,共6页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(70872076) 上海"科技创新行动计划"项目(11dz1121803) 江苏南通市科技创新计划(工业)(AA2010048)
关键词 空间调度 多目标优化 粒子群算法 船舶建造 spatial scheduling multi-objective optimization improved particle swarm optimization shipbuilding
  • 相关文献

参考文献9

  • 1Park K, Lee K, Park S, et al. Modeling and solving the spatial block scheduling problem in a shipbuilding company [J]. Computers Industrial Engineering, 1996, 30(3) : 357-364. 被引量:1
  • 2刘建峰,秦士元,应长春.船体分段制造日程计划的模拟与优化[J].中国造船,2000,41(4):13-21. 被引量:28
  • 3Shin Jong Gye, Kwon Oh Heung, Ryu Cheolho. Heuristic and metaheuristic spatial planning of assembly blocks with process schedules in an assembly shop u- sing differential evolution [J]. Production Planning and Control, 2008, 19(6):605-615. 被引量:1
  • 4Varghese Ranjan, Young Yoon Duck. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm[C]//Proceedings of the 3rd International IEEE Conference on Industrial Informatics. Perth, Australia:lEEE Press, 2005 : 444-449. 被引量:1
  • 5Li Bo, Zhao Zhi-yan, Li Gang. A dynamic scheduling method for spatial layout planning[C]//Proceedings of the Fourth International Conference on Machine Learn- ing and Cybernetics. Guangzhou, China: IEEE Press, 2005 : 18-21. 被引量:1
  • 6Ryu C, Shin J G, Kwon O H, et al. Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding[J]. International Jour- nal of Computer Integrated Manufacturing, 2008, 21 (8) :911-922. 被引量:1
  • 7Koh Shiegheun,Eom Chanho, Jang Junghee, etal. An improved spatial scheduling algorithm for block assem- bly shop in shipbuilding company[C]//Proceedings of the 3rd International Conference on Innovative Compu- ting Information and Control. Liaoning, China: IEEE Press, 2008 : 253-253. 被引量:1
  • 8He Gui-xia, Gao Jia-quan. A novel weight-based im- mune genetic algorithm for multi-objective optimization problems[C]//Proceedings of the 6 th International Symposium on Neural Networks: Advances in Neural Networks-Part II. Berlin: Springer-Verlag, 2009 : 500- 509. 被引量:1
  • 9Yang Xue-ming. A modified particle swarm optimizer with dynamic adaptation[J].Applied Mathematics and Computation, 2007,189: 1205-1213. 被引量:1

二级参考文献3

共引文献27

同被引文献20

  • 1郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 2LEEK J, LEE J K, CHOI S Y. A spatial scheduling system and its application to shipbuilding:DAS-Curve[J]. Expert Sys- tems with Applications, 1996,10(3) : 311-324. 被引量:1
  • 3LEEJ K, LEE K J, PARK H K, et al. Developing scheduling systems for Daewoo shipbuilding: DAS project JT. European Journal of Operational Research, 1997,97(2) : 380-395. 被引量:1
  • 4LEEK J. Sufficient search space for spatial expert systems[J]. Expert Systems with Applications, 2000,19 (1) : 1-8. 被引量:1
  • 5LIU Z, HUAT D C K, WEE K H. Scheduling dynamic block assembly in shipbuilding through hybrid simulation and spatial optimization[J]. International Journal of Production Research, 2012,50 (20) : 5986-6004. 被引量:1
  • 6VARGHESE R J, YOON D Y. Dynamic spatial block ar- rangement scheduling in shipbuilding industry using genetic algorithm[C]//Proceedings of the 3rd International IEEE Conference on Industrial Informatics. Washington, D. C. , USA: IEEE,2005 : 444-449. 被引量:1
  • 7SHIN J G, KWON O H, RYU C. Heuristic and metaheuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution[J]. Production Planning Control,2008,19(6):605-615. 被引量:1
  • 8王蕾,张志英.基于规则的船体曲面分段空间调度方法[J].上海交通大学学报,2009,43(11):1709-1714. 被引量:7
  • 9张志英,杨克开,于瑾维,陈强.改进粒子群算法的动态空间调度方法[J].哈尔滨工程大学学报,2009,30(12):1344-1350. 被引量:12
  • 10陶宁蓉,蒋祖华,刘建峰.带时间窗约束的船体分段空间调度问题[J].计算机集成制造系统,2010,16(12):2674-2679. 被引量:9

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部