期刊文献+

110kV大粤线N27塔夏季污情分析 被引量:3

Summer Pollution Situation Analysis of Tower No.27 on 110 kV Dayue Lines
原文传递
导出
摘要 分析了位于沿海化工产业区的110 kV大粤线N27塔夏季(6-8月)监测数据,确认大雨冲刷之后的清洁绝缘子出现连续爬电现象是湿沉降侵入所致。监测结果表明,泄漏电流与相对湿度出现非对应关系和泄漏电流的折线特征,是早期湿沉降侵入的重要信号。盐/灰密测试涉及不到湿沉降内容,研究、制定湿沉降的测试标准,是电力防污面临的的新课题。 The summer(June-August)on-line monitored data of the No.27 tower on Dayue 110 kV overhead lines located in the coastal chemical industry zone was analyzed.It was confirmed that the continuous creepage phenomenon in the clean insulators after a heavy rain was caused by immersion of moist dust pollution.Monitoring results showed that,the asynchronism between the leakage current and relative humidity,and the broken line features of leakage current are significant signals of early moist dust pollution.The measurement of ESDD and NSDD are not involved with the moist dust pollution.To study and develop the test standards for moist dust pollution will be the new task for electricity power antipollution.
机构地区 珠海供电局
出处 《电瓷避雷器》 CAS 北大核心 2012年第1期8-13,共6页 Insulators and Surge Arresters
关键词 湿沉降 污秽 相对湿度 泄漏电流 爬电 折线特征 moist dust pollution pollution relative humidity leakage current creepage broken line characteristics
  • 相关文献

参考文献13

二级参考文献57

共引文献278

同被引文献41

引证文献3

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部