期刊文献+

霸王河1号特大桥连续梁转体全站仪测量监控技术 被引量:3

The Overall Station Measurement and Monitoring Technology of Bawang River No.1 Bridge Continuous Beam
下载PDF
导出
摘要 介绍了全站仪测量监控支架现浇连续梁转体的原理和方法,结合集包增建第二双线工程霸王河1号特大桥支架现浇连续梁转体实例,验证了本桥梁测量和监控方法的正确性及有效性,确保支架现浇连续梁转体达到了设计要求的合理成桥状态。 This paper introduces the principles and methods of the overall station measurement and monitoring east-in-situ continuous beam twist of brackets. Combined with the example of the second lane project, Bawangqiao No. 1 Bridge (60 + 100 + 60 ) meter cast-in-situ continuous beam twist of brackets along Jining-Baotou railway, the method correctness and validity of measuring and monitoring of the bridge are verified, henceforth ensure cast-in-situ continuous beam twist of brackets meet the design requirements into a reasonable state of from a bridge.
出处 《铁道建筑技术》 2012年第1期66-69,73,共5页 Railway Construction Technology
关键词 连续梁 转体 支架现浇 全站仪监控 continuous beam twist cast-in-situ beam overall station monitoring
  • 相关文献

参考文献2

二级参考文献5

共引文献14

同被引文献41

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部