期刊文献+

考虑供电公司风险的激励性可中断负荷合同模型

A model for incentive interruptible load contract considering the risk of power supply company
下载PDF
导出
摘要 考虑到供电公司的风险偏好及用户的可中断电量,应用委托代理及机制设计理论建立了一种用户类型离散的可中断负荷合同模型。分析和算例结果表明,无论供电公司的风险偏好如何,该合同模型均能引导用户披露真实信息,实现电力资源的有效配置,且供电公司能从中节约供电成本。因此,激励性可中断负荷合同不仅能提高用户需求弹性.还有助于供电公司回避市场风险。 Considering the risk preference of power supply companies and maximum interruptible power of customers, an interruptible load contract model for discrete customer types is established by use of the theories of principal - agent and mechanism design. The results of analysis and calculation example show that, whatever risk preference of the power supply may be, this contract can lead customers to voluntarily disclosure their true information and so the power resources can be efficiently allocated, and the power supply company can save cost. Therefore, the incentive inteiTuptible load contracts can not only improve customers' demand elasticity, but also helps power company to avoid market risk.
机构地区 贵州大学
出处 《贵州电力技术》 2011年第2期11-13,共3页 Guizhou Electric Power Technology
关键词 市场风险 电力市场 委托代理 机制设计 market risk electricity market principal - agent mechanism design
  • 相关文献

参考文献3

二级参考文献20

  • 1方勇,李渝曾.电力市场中激励性可中断负荷合同的建模与实施研究[J].电网技术,2004,28(17):41-46. 被引量:54
  • 2张显,王锡凡,王建学,陈芳华.可中断电力合同中新型期权的定价[J].中国电机工程学报,2004,24(12):18-23. 被引量:47
  • 3康重庆.综合资源规划的研究[M].北京:清华大学,1997.. 被引量:3
  • 4Mielczarski W,Michalik G.Open electricity markets in Australia:contract and spot price[J].IEE Power Engineering Review,1999,19(2):49-53. 被引量:1
  • 5GedraTW,VaraiyaPP.Markets and pricing or interruptible electric power[J].IEEETrans.onPWRS,1993,8(1):122-128. 被引量:1
  • 6Gedra T W.Optional forward contracts for electric power markets[J].IEEETrans.onPWRS,1994,9(4):1766-1773. 被引量:1
  • 7David A K.Modeling risk in energy contracts with investor owned generation[J].IEE Proc.Pt-C,Gt&D,1994,141(1):75-80. 被引量:1
  • 8David A K.Risk modeling in energy contracts between host utilities and BOT plant investors[J].IEEE Trans.on Energy Conversion,1996,11(2):359-365. 被引量:1
  • 9Chung T S,Zhang S H,Yu C W,et al.Electricity market risk management using forward contracts with bilateral options[J].IEE Proceedings-Generation,Transmission and Distribution.2003,150(5):588-594. 被引量:1
  • 10Fahrioglu M,Alvarado F L.Designing incentive compatible contracts for effective demand management[J].IEEE Trans.on PWRS,2000,15(4):1255-1260. 被引量:1

共引文献95

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部