摘要
竖井结构在施工过程中的安全稳定非常重要,同时其工程的经济性也是十分必要的.主要的研究方法是根据现场施工情况,结合监测手段,将监测数据与预测值比较,可以判断上步施工工艺和施工参数是否合理,同时实现对下步施工工艺和施工进度控制.青岛某区间竖井采用矿山法施工,对施工监测数据进行分析,表明,竖井的设计与施工方法适应所处的地质条件,取得了安全、经济的效果.
Security and stability of shaft structure in the construction process is very important;while ensuring project economy is also essential.The main research way is that according to the construction site situation and combining with the monitoring data to compare with forecast data and analyze the shaft construction technology.It can judge whether the construction technology and parameters is reasonable,and control the contruction technology and schedule of next step.For a Qingdao metro interval shaft,the mining method is used;and the monitoring data are analyzed.The results show that the design and construction methods of metro shaft are suited with its geological condition,so as to reach the effectiveness in safety and economy.
出处
《三峡大学学报(自然科学版)》
CAS
2011年第4期54-56,共3页
Journal of China Three Gorges University:Natural Sciences
关键词
地铁
竖井施工
矿山法
监测分析
metro
shaft construction
mining method
monitoring analysis