摘要
主要介绍了新建火电厂辅助车间网络控制系统总体规划以及辅助车间网络控制系统软、硬件配置需要考虑的几个问题。并对各种软、硬件设备的优缺点进行了分析比较。
This paper mainly addresses the overall planning of network control system for auxiliary workshop in newly built thermal power plant and several issues in software and hardware configuration of network control system for auxiliary workshop. A comparison and analysis was made for various software and hardware in terms of its advantages and disadvantages.
出处
《华北电力技术》
CAS
2009年第5期25-28,共4页
North China Electric Power