华能玉环电厂1000MW超超临界2号机组凝汽器组合安装施工技术方案 被引量:3

Technical Installation Plan for No.2 1000 MW USC Unit Condenser of Huaneng Yuhuan Power Plant
原文传递
导出
摘要 凝汽器是发电厂重要设备之一,凝汽器的安装速度和质量直接影响着整个工程施工进度网络节点的顺利实现和今后整机的运行水平。华能玉环电厂2号机凝汽器安装施工过程中,克服了多种不利因素,制定科学便捷的施工工序和施工方案,以最短的时间完成了凝汽器的整体安装任务,为后续的酸洗和吹管,以至整套启动赢得了宝贵的时间。 As one of the key equipment of a power plant,the speed and quality of condenser installation directly' determines the schedule of whole project and future unit operation.During the process of condenser installation of Huaneng Yuhuan Power Plant's No.2 unit,rational and efficient construction procedures and plans are established after numerous unfavorable factors have been overcome.The task has been accomplished in the shortest possible time,saving precious time for following acid washing and pipe blowing,as well as entire system startup.
出处 《电力建设》 2009年第1期59-62,共4页 Electric Power Construction
基金 国家重点工程项目(发改能源[2007]1697号)
关键词 凝汽器 隔板 管板 接颈 组装 钛管 焊接 condenser diaphragm tube plate linking neck assembling titanium pipe welding
  • 相关文献

参考文献10

  • 1陈书平,李健平.华能玉环电厂4×1000MW超超临界机组工程建设实践[J].电力建设,2006,27(7):17-21. 被引量:12
  • 2柯文石.华能玉环电厂1000MW超超临界机组建设的探讨与实践[J].电力建设,2005,26(6):1-5. 被引量:21
  • 3DL5000-2000火电发电厂设计技术规程[S].北京:中国电力出版社.2001. 被引量:16
  • 4郑体宽主编..热力发电厂[M].北京:水利电力出版社,1995:274.
  • 5钟史明主编..火电厂设计基础[M].北京:中国电力出版社,1998:202.
  • 6张磊,李广华主编..锅炉设备与运行[M].北京:中国电力出版社,2007:384.
  • 7刘俭.火力发电厂安全性评价[M].北京:中国电力出版社,2003. 被引量:7
  • 8火电施工竣工技术资料标准化表格应用手册[M].北京:中国水利出版社.2006. 被引量:2
  • 9胡荣祖,史启祯主编..热分析动力学[M].北京:科学出版社,2001:218.
  • 10中国动力工程学会主编..火力发电设备技术手册 第4卷 火电站系统与辅机 第5章 燃料输送系统[M].北京:机械工业出版社,1998:26.

二级参考文献2

共引文献43

同被引文献7

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部