文章介绍了浙江华能玉环4×1000MW电厂工程500kV升压站、发变组、厂用电系统计算机监控、微机型继电保护和自动装置的系统配置和功能特点,在电厂二次线设计以及先进设备的使用做了统一的系统规划,并获得了有效的实施。
This paper briefly introduces system configurations and functions of 500 kV step-up substation, generator-transformer unit, auxiliary power supply system computer monitoring, computer-controlled relay protection, and automation devices of Huaneng Yuhuan Power Plant 4×1 000 MW project. Unified system planning are applied on power plant secondary connection design and advanced equipment application. The planning was implemented successfully.
出处
《电力建设》
2008年第4期70-71,74,共3页
Electric Power Construction
关键词
监控系统
继电保护
自动装置
monitoring system
relay protection
automation device