华能玉环电厂是我国首个自主设计的1 000 MW超超临界机组工程。介绍了1 000 MW超超临界机组初步设计阶段和施工图设计阶段的工程造价控制,为百万千瓦级超超临界机组工程造价控制提供参考。
Huaneng Yuhuan Power Plant uses China's first independently developed 1 000 MW USC units. This paper introduces construction cost control in preliminary design and shop drawing design stages of the USC units, providing reference for mega-watt class USC unit construction cost control.