摘要
根据国电四川白马电厂已建23号(1×200MW)机组烟囱情况,在采用石灰石-石膏湿法烟气脱硫工艺,且不装设GGH的情况下,对烟囱的防腐处理方案进行了研究和技术经济比较,提出本工程烟囱改造的推荐方案。
According to the actual condition of the 1 × 200 MW units stack which adopted the lime/limestone wet - flue gas desulfurization process without GGH in Baima Power Plant, the stack anticorrosion plans were researched and compared. The recommend reformation plan of stack anticorrosion was proposed.
出处
《电力环境保护》
2008年第1期25-27,共3页
Electric Power Environmental Protection
关键词
湿法脱硫
单筒砌体烟囱
防腐
wet flue gas desulfurization
single bricking - up chimney
anticorrosion