期刊文献+

一种解决有AGV小车约束的车间智能调度问题的算法 被引量:17

An Algorithm for Job Shop Scheduling in Dual Resource Constrained with AGV
下载PDF
导出
摘要 考虑AGV小车在车间调度中只参与运输工件的特点和小车的运输路线对工件工艺路线选择的影响,分析了在机床/AGV小车双资源约束下的车间调度问题,讨论了AGV小车在车间调度中的调度机制。在分析问题的基础上建立了有AGV小车参与调度的车间调度问题的数学模型,并提出了基于遗传算法的机床/AGV小车的调度算法,论述了编码、选择和变异操作的规则,提出了工序特征的交叉算子。仿真结果表明,该算法是可行的,可以获得比较好的效果,为在AGV小车约束下的车间调度提供了一种有效的实践途径。 In job shop scheduling, AGV only plays the role of parts transportation and its route selection influences the choice of alternative processing path. The dispatching mechanism of AGV was discussed in detail. A mathematical model was built on analysis of the dual resource constrained problem. The architecture of a dispatching approach with genetic algorithm was proposed to solve job shop scheduling problem under dual resource constrained of machine and AGV. A crossover operation based on operation features was designed to transmit the relationship of the parent chromosomes. Coding, selection and mutation were also discussed in detail. The simulation result shows that the approach is feasible and provides a good practical way for job shop scheduling under dual resource constrained of machine and AGV.
机构地区 浙江大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2007年第15期1810-1813,共4页 China Mechanical Engineering
基金 浙江省重大科技攻关项目(2004-05)
关键词 车间调度 AGV小车 数学模型 遗传算法 job shop scheduling AGV(automatic guidance vehicle) mathematical model genetic algorithm
  • 相关文献

参考文献7

  • 1何霆,刘飞,马玉林,杨海.车间生产调度问题研究[J].机械工程学报,2000,36(5):97-102. 被引量:105
  • 2Iris F A V.Survey of Research in the Design and Control of Automated Guided Vehicle Systems[J].European Journal of Operational Research,2006,17:677-709. 被引量:1
  • 3孙志峻,朱剑英.含机器人的作业车间双资源智能优化调度[J].机器人,2002,24(4):342-345. 被引量:1
  • 4孙志峻..智能制造系统车间生产优化调度[D].南京航空航天大学,2002:
  • 5朱剑英著..智能系统非经典数学方法[M].武汉:华中科技大学出版社,2001:331.
  • 6李敏强等著..遗传算法的基本理论与应用[M].北京:科学出版社,2002:425.
  • 7Cheng Runwei,Gen Missuo,Yasuhiro Tsujimura.A Tutorial Survey of Job-shop Scheduling Problems Using Genetic Algorithms-I[J].Computers & Industry Engineering,1996,130(4):983-997. 被引量:1

二级参考文献20

  • 1袁晓光,王作江,刘建军,韩铁.后腹腔镜肾癌根治术治疗T2期肾癌临床疗效观察[J].中国肿瘤临床与康复,2020,0(2):211-213. 被引量:8
  • 2张道远,陆正,陆伟,杜素花,班德文.单孔与传统后腹腔镜肾癌根治术的比较研究[J].临床泌尿外科杂志,2020,0(3):220-223. 被引量:7
  • 3[1]Gargeva V B, Deane R H. Scheduling research in multiple resource constrained job shop: a review and critique. International Journal of Production Research, 1996,34(8): 2077-2097 被引量:1
  • 4[2]Treleven M D, Elvers D A. An investigation of labor assignment rules in a dual resource constrained system research. The Journal of Operations Management, 1985,6(1):51-58 被引量:1
  • 5[3]Treleven M D. A review of the dual-resource constrained system research. IIE Transactions,21:279-287 被引量:1
  • 6[4]Miller J G, Berry W L. Heuristic methods for assignment men to machines: an experimental analysis. AIIE Transactions ,1974,6: 97-104 被引量:1
  • 7[5]K K B Hon, H Chi. A new approach of group technology part families optimization. Annals of the CIRP,1994,43(1): 425 被引量:1
  • 8[6]Jain A, K, Eimaragy H A. Single process plan scheduling with genetic algorithms. Journal of Production Planning & Control, 1997,8(4): 363-376 被引量:1
  • 9[7]H P Wiendahl, R Garlichs. Decentral production scheduling of assembly systems with genetic algorithm. Annals of the CIRP,1994,43(1): 389 被引量:1
  • 10[8]N Wong, M C Leu. Adaptive genetic algorithm for optimal printed circuit board assembly planning. Annals of the CIRP,1993,42(1):17 被引量:1

共引文献104

同被引文献138

引证文献17

二级引证文献157

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部