软件项目进度跟踪方法的综合研究 被引量:8

Integrated Research of Schedule Tracking Methods of Software Project
下载PDF
导出
摘要 进度是软件项目的第一大风险,受到顾客和承制方的高度关注。该文概述了软件项目的进度管理机制,对历史上主要的6种软件项目进度跟踪方法:里程碑进度,人为设定活动进度,工作单元进展,挣值法,甘特图和网络图进行了比较说明,从计算公式、使用时机、使用性能和发展进化等方面指出了它们各自的特点,推荐了最佳软件进度跟踪方案。 Schedule is the top risk of software project, hence, it is a common focus on attention of customer and supplier. The schedule management mechanism of software project is described. The main six schedule tracking methods of software project used in the history such as milestone schedule, man-made activity schedule, working unit progress, earned value, gantt chart and network chart are compared and explained. Every method and its characteristics are described by explaining its calculation formulas, application time, application performance, evolution and other aspects. The best solution of schedule tracking of software project is recommended.
作者 梁成才
出处 《计算机工程》 CAS CSCD 北大核心 2007年第3期56-58,75,共4页 Computer Engineering
关键词 软件项目 进度跟踪方法 工作分解结构 计划值(估计值) 实际值 Software project Schedule tracking method Work breakdown structure(WBS) Planned value(estimated value) Actual value
  • 相关文献

参考文献6

  • 1Hughes B,Cotterell M.软件项目管理[M].周伯生,廖彬山,任爱华,等,译.北京:机械工业出版社,2004-07. 被引量:1
  • 2韩万江,姜立新编著..软件项目管理案例教程[M].北京:机械工业出版社,2005:302.
  • 3McGrry J,Card D,Jones C.实用软件度量[M].吴超英,廖彬山,译.北京:机械工业出版社,2003-09. 被引量:1
  • 4郑人杰,王纬,王方德等.基于软件能力成熟度模型(CMM)的软件过程改进[M].北京:清华大学出版社,2003. 被引量:11
  • 5DeMarco T,Lister T.与熊共舞[M].熊节,马姗姗,译.北京:清华大学出版社,2004-03. 被引量:1
  • 6荣钦科技著,杨志波改编..Project 2003在项目管理中的应用[M].北京:电子工业出版社,2006:389.

共引文献10

同被引文献26

引证文献8

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部