摘要
结合工程实例,通过对场地工程地质条件的分析,探讨了振冲碎石桩加固地基的施工工艺及其施工过程,并对复合地基的承载力进行了检测,对振冲碎石桩加固地基中的一些问题进行了综合分析并提出了改进建议。
Combined with practical work and based upon analysis of engineering geological conditions construction technology of vibro-replacement stone column in foundation reinforcement is discussed. Bearing capacity of composite foundation is detected. According to problems encountered in application corresponding suggestions are proposed for improvement.
出处
《山西建筑》
2007年第5期125-126,共2页
Shanxi Architecture
关键词
振冲碎石桩
加固地基
承载力
vibro-replacement stone column, foundation reinforcement, bearing capacity