期刊文献+

高填石路堤工期沉降与工后沉降实用计算方法研究 被引量:4

Study on Settlements of High Rock Embankment During and After Construction and Its Practical Calculation Method
下载PDF
导出
摘要 针对西南地区公路建设中高填石路堤的施工期沉降和工后沉降问题,以工程实际和工程界熟悉的方法为前提,考虑了高填石(高应力水平)下地基的非线性性质和实际的应力路径计算路基沉降;考虑目前碾压技术的进步而采用弹性模型计算填石路堤的变形.两者叠加得总沉降,再由此求得工期沉降和工后沉降.最后与工程的现场实测比较,证明本文方法简单可行,可供同类工程参考和利用. To solve the problem of the settlement of high rock-filled embankments during and after construction for the roads in Southwest China, the settlement of subgrade was calculated by considering the nonlinear character of the subgrade under high stone fill (high stress level) and its actual stress path, based on the actual situations of engineering and methods known to the engineering circle. An elastic model was used to calculate the deformation of the rock embankment by considering the present improved compaction techniques. The total settlement was obtained by adding the two parts. And then, the settlements during and after construction were calculated. In the end, the good agreement between the computed and the measured values of field tests showed that the proposed approach was simple, feasible and practical.
作者 曹喜仁
出处 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2005年第2期54-58,共5页 Journal of Hunan University:Natural Sciences
基金 广西自治区交通建设基金资助项目(200202)
关键词 基础沉降 高填石路堤 应力路径 计算方法 foundations-settlement high rock-filled embankment stress path calculation method
  • 相关文献

参考文献8

二级参考文献17

共引文献67

同被引文献32

引证文献4

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部