摘要
分析了基本作业方式的"通用—特例"关系,提出了全面研究上述基本作业方式的通用作业计划的概念,建立了通用作业计划非连接图模型及基于蚁群算法的优化方法。算例研究假定一制造系统包含开放作业、异顺序作业、混杂流水作业三种作业方式,将其按照通用作业计划方式采用蚁群算法进行优化,所得的近优加工流程时间显著优于采用穷举法对三种作业方式分别优化所得的最优解。
After the relationship of Universal-Special in basic shops was analyzed, the concept of Universal Shop scheduling Problem (USP), which included all basic shop scheduling problems, was put forward. A disjunctive graph model representing USP was established, and the Ant Colony Optimization (ACO) used for USP was demonstrated. A case study assumed that a manufacturing system contained OSP, JSP and HFSP. When the system was treated as USP, the approximately optimal makespan computed by ACO was obviously better than the least makespan by enumerating all the possible solutions as the three shops were scheduled separately.
出处
《计算机集成制造系统》
EI
CSCD
北大核心
2005年第1期104-108,共5页
Computer Integrated Manufacturing Systems
基金
国家自然科学基金资助项目(70171042)。~~
关键词
通用作业计划
作业排序
蚁群算法
生产管理
universal shop scheduling
sequencing
ant colony optimization
production management