摘要
本文以平顶山一矿为例,建立了编制矿井生产计划的计算机模型,并运用系统工程的理论方法对矿井开采的决策环节进行计算机的最佳决策研究,从而提供了编制矿井最佳生产计划的计算机模型及软件。
Taking No.1 Mine, Pingdingshan Bureau as an example, a general model is made for working out a mine production plan. System engineering theory is applied for making optimal decision in some decisive links of production aided by computer. A model and softwares are provided for programming optimal production plan.
出处
《煤炭学报》
EI
CAS
CSCD
北大核心
1993年第5期55-62,共8页
Journal of China Coal Society
关键词
煤矿开采
生产计划
计算机应用
mining network
system simulation
working face
balancing of mining and excavation