摘要
露天矿矿体计算机模型的建立是进行矿床开采境界优化及制定矿山生产计划的基础。为实现矿山生产现代化管理,德兴铜矿建立了大型露天矿山矿体计算机模型,并获得成功应用,对类似矿山具有参考意义。
The establishment of the computer model for the ore body of open pit mine is the basis for the optimization of deposit mining boundary and the mining production scheduling.For realizing the modernization management of mine production,Dexing Copper Mine has established a computer model for the ore body of large open pit mine.Its successful application has of reference significance to other similar mines.
出处
《金属矿山》
CAS
北大核心
1997年第8期5-9,共5页
Metal Mine