摘要 采用特征线法 ,对葛洲坝电站水轮机增容改造甩负荷过渡过程进行了计算 ,给出了蜗壳最大压力及机组最大速率上升的数值。特征线法的原理是将流体运动方程和连续性方程转化为四个全微分方程 ,然后求解 ,计算精度较高。 The hydraulic transient calculation for rejecting load is carried out adopting explicit characteristics method. The maximum pressure taking place in spiral case and the unit maximum speed rise are given also. The principle of explicit characteristics method is transforming hydraulic dynamics equations and mass conservation equations into four total differential equations,and then resolving the equations. The explicit characteristics method is more accurate than traditional calculation method.
作者 王宏 闫志国
出处 《大电机技术》 北大核心 2004年第6期48-51,共4页 Large Electric Machine and Hydraulic Turbine
关键词 水轮机 增容改造 甩负荷过渡过程 特征线法 葛洲坝电站 uprating and rehabilitating hydraulic transient explicit characteristics method
  • 相关文献

参考文献1

  • 1A.J.Stepanoff. Centrifugal and Axial Pumps[M].JOHN WILEY & SONS, Inc, 1957. 被引量:2

共引文献1

同被引文献10

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部