国电热工研究院采用现场初步检验与割管细致检验相结合的方法 ,对某电厂水冷壁的当前实际状态进行了详细检验 ,同时引入新的风险评估研究成果 ,对其失效风险进行了分析和评估 。
Combined field preliminary inspection with careful tube cutting inspection, a detailed inspection of the water wall real state in a power station at present has been carried out by Thermal power Research Institute (TPRI) Under State Power Corp. At the same time, the new research achievement of risk evaluation has been used for failure risk analysis and evaluation, and the evaluation results of different tubulatures being given.