摘要
讨论了在满足卸点产量和品位要求的前提下的铁矿运输问题。针对不同的原则建立一般的最优生产计划模型并求解。与经典的线性规划方法相比 。
This paper discusses the problem on iron ore transport at meeting the requirement.A optimum model of the production plan on the different principles is constructed and solved.Compared with the classical linear programming method,the presented method is superior to the classical.The results show that the empolyed is feasible.
出处
《东北电力学院学报》
2004年第2期37-41,共5页
Journal of Northeast China Institute of Electric Power Engineering
关键词
铁矿运输
车辆调度
优化安排
线性规划
多目标规划
露天矿
Opencut iron mine
Vehicle arrangement
Optimum
Fast algorithm
Multiobjective programming