期刊文献+

核电厂凝汽器故障信号定值的计算与分析 被引量:6

Nuclear Power Station Condenser Unavailable Calculation and Analysis
下载PDF
导出
摘要 核电厂的凝汽器压力达到"不可用"设定值后,将禁止旁路蒸汽向凝汽器排放。CPR1000系列反应堆要求,在紧急停堆先于凝汽器达到"不可用"设定值之前发生的情况下,仍能通过旁路系统继续向凝汽器排放蒸汽10~12s,否则将引起主蒸汽系统管路超压。某些瞬态工况下,凝汽器的压力上升较快,为满足核岛蒸汽安全排放的要求,需对瞬态工况下凝汽器的压力变化进行仿真计算。本文通过模拟汽轮机紧急停机及紧急停堆后的凝汽器压力变化规律,研究满足核岛蒸汽安全排放要求的技术方案,解决瞬态工况下主蒸汽管道的超压问题。 If the pressure of condenser is higher than the set-point value defined as 'condenser unavailable', it will be forbidden to dump any steam into the condenser. As a requirement of CPR1000 nuclear power station, bypass steam must be discharged to condenser at least 10-12 seconds incessantly after the reactor has tripped, otherwise the pipes of the main steam system will be overpressure. As the pressure of the condenser will rise rapidly during some transient conditions, a transient calculation about condenser is needed to meet the requirement of safe dumping steam for nuclear island. A transient calculation in this paper will simulate the pressure variety of condenser related with turbine trip and reactor trip, and the technical solution about avoiding main steam system overpressure is analyzed for safe dumping steam from the nuclear island.
出处 《核动力工程》 EI CAS CSCD 北大核心 2009年第S2期39-44,共6页 Nuclear Power Engineering
关键词 瞬态分析 凝汽器压力 循环水泵瞬态流量 旁路蒸汽 Transient analysis, Condenser pressure, Transient flow of circulating water pump, Bypass steam
  • 相关文献

参考文献2

  • 1西北电力设计院编..电力工程水务设计手册[M].北京:中国电力出版社,2005:998.
  • 2杨世铭,陶文铨编著..传热学 第3版[M].北京:高等教育出版社,1998:447.

同被引文献30

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部