1LAISERIN J. Comparing pommes and naranjas[EB/OL].http://www.Laiserin.com/,2002. 被引量:1
2GUO H L,LI H,SKITMORE M. Life cycle management of construction projects based on Virtual Prototyping technology[J].{H}JOURNAL OF MANAGEMENT IN ENGINEERING,2010,(1):41-47. 被引量:1
3Wong A K D,Wong F K W,Nadeem A. Comparative roles of major stakeholders for the implementation of BIM in various countries[A].Development Bureau,Government of the Hong Kong Special Administrative Region,2009. 被引量:1
4Dossick C S,Neff G. Organizational divisions in BIM-enabled commercial construction[J].{H}Journal of Construction Engineering and Management,2009,(4):459-467. 被引量:1
5Linderoth H C J. Understanding adoption and use of BIM as the creation of actor networks[J].{H}AUTOMATION IN CONSTRUCTION,2010,(1):66-72. 被引量:1
6Singh,V,N.Gu,X.Wang. A theoretical framework of a BIM-based multi-disciplinary collaboration platform[J].{H}AUTOMATION IN CONSTRUCTION,2011,(2):134-144. 被引量:1
7Sanguinetti,P. General system architecture for BIM:An integrated approach for design and analysis[J].{H}ADVANCED ENGINEERING INFORMATICS,2012,(2):317-333. 被引量:1
8Jung,Y,M.Joo. Building information modelling (BIM) framework for practical implementation[J].{H}AUTOMATION IN CONSTRUCTION,2011,(2):126-133. 被引量:1
9Yah W,Culp C,Graf R. Integrating BIM and gaming for real-time interactive architectural visualization[J].{H}AUTOMATION IN CONSTRUCTION,2011,(4):446-458. 被引量:1
10Redmond A,Hore A,Alshawi M. Exploring how information exchanges can be enhanced through Cloud BIM[J].{H}AUTOMATION IN CONSTRUCTION,2012.175-183. 被引量:1