期刊文献+

基坑工程地下一、二层交界区支护体系的设计与分析 被引量:1

Design and analysis of bracing system for junction of basement floor No.1 and No.2 of a foundation pit
下载PDF
导出
摘要 结合某项目基坑工程设计实例,介绍了一种基坑工程地下一、二层交界区支护体系的设计分析方法。同时,选用岩土工程有限元程序Z_SOIL.PC 2013,运用三维数值分析方法对本方法进行建模计算,并将计算结果与实测数据加以比较分析,证明了该设计方法的可行性,最后,针对本工程的实践情况,总结了一些工程体会。 According to the design example of a foundation pit, a method for design and analysis of bracing system for the junction of basement floor No. 1 and No. 2 is introduced. Meanwhile, the geotechnical FEM software Z_SOIL.PC 2013 is adopted to calculate the model by using 3D numerical analysis method. The results of the numerical analysis are compared with the measured ones, indicating the feasibility of the proposed design method. Finally, some experience of the project is summarized.
作者 郭代培
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2014年第S1期46-50,共5页 Chinese Journal of Geotechnical Engineering
关键词 超大深基坑 分区开挖 斜撑 三维数值分析 ultra-large deep foundation pit partition excavation inclined bracing 3D numerical analysis
  • 相关文献

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部