珠海市高新区项目基坑面积大、周围地质复杂,对钢管支撑定位与安装技术有较高的要求。本文针对基坑支撑拆装效率和支撑效果相互协调问题展开相关研究与应用,为相关深基坑组合内支撑工程施工提供参考和借鉴。
The foundation pit area of zhuhai High-tech Zone project is large and the surrounding geology is complex,which requires high positioning and installation technology of steel pipe support.In this paper,related research and application are carried out on the coordination between the efficiency of foundation pit support disassembly and support effect,providing reference and reference for the construction of related deep foundation pit combined internal support engineering.
作者
杨晓坡
YANG Xiao-po(Shanghai Shefa Puzhong Construction Management Co.,Ltd.,Shanghai 200120,China)
出处
《价值工程》
2022年第16期83-85,共3页
Value Engineering
关键词
双榀大直径
钢管支撑梁
定位安装
two trusses of large diameter
steel tube support beam