期刊文献+

国内外电力市场辅助服务新发展状况综述 被引量:8

Review for New Development of Ancillary Services of National and International Power Makets
下载PDF
导出
摘要 电力市场改革中一个不可忽视的部分是对保证电网安全性的各种辅助服务的分析与研究 ,旨在对辅助服务提供量化标准 ,独立计算成本以及提升辅助服务的质量 ,以最大限度地保证整个系统的安全运营。收集并研究了近年来国内外学者在电力市场辅助服务研究领域的成果以及经验教训 ,对辅助服务研究的新状况作了一个概述 ,在此基础上提出了国内与国外将来在辅助服务领域的重点研究方向。 The key part of power market reform is the research on the ancillary services that are responsible for the security of power network in order to product the standard of the quantity of ancillary services, to compute the cost of ancillary services and help to improve the quality of ancillary services, thus the security of the whole electricity system would be guaranteed. This paper mainly collects and makes research on the new achievements and the experiences of national and international ancillary services fields in power market in recent years. This paper also presents a general study on the current services ancillary researches and based on it this paper have addressed the main develop direction of the national and international services ancillary fields.
出处 《现代电力》 2003年第6期85-90,共6页 Modern Electric Power
基金 国家自然科学基金资助项目 (项目号 :70 0 710 0 9)
关键词 电力市场 辅助服务 电价 电力行业 市场需求 power market ancillary services general study
  • 相关文献

参考文献16

  • 1[1]Xingwang Ma, Sun D. I. , Cheung K. W. Evolution toward standardized market design. IEEE Transactions on Power Systems, 2003, 18 (2): 460~469. 被引量:1
  • 2[2]Le Anh Tuan, Bhattacharya K. Competitive framework for procurement of interruptible load services.IEEE Transactions on Power Systems, 2003, 18(2): 889~897. 被引量:1
  • 3倪以信.电力市场输电服务和辅助服务及其定价[J].电力系统自动化,2002,26(16):5-7. 被引量:3
  • 4[4]Ni E. , Luh P. B. Optimal integrated generation bidding and scheduling with risk management under a deregulated daily power market. power Engineering Society WinterMeeting, IEEE, 2002, 1 (1): 70~76. 被引量:1
  • 5焦连伟,文福拴,祁达才,林济铿,倪以信.电力市场中辅助服务的获取与定价[J].电网技术,2002,26(7):1-6. 被引量:39
  • 6张健,曹志东,许洪强,张元鹏,王晓峰,林启新,朱明祥.发电侧电力市场辅助服务付费新模型[J].电力系统自动化,2002,26(10):9-12. 被引量:19
  • 7[7]Ikeda Y.,Imai N.,Ohtake T.,Iwamoto S. Aconsideration on rate of reactive power service from generators in liberalized power market. Asia Pacific Transmission and Distribution Conference and Exhibition, Ⅲ,2002, 3 (10): 1996~2001. 被引量:1
  • 8[8]Chan C. Y. , Ni Y. X. , Wu F. F. A study of operating reserve procurance in power markets with application of insurance theory: contract-based vs poolbased approaches. Power Engineering Society Summer Meeting, IEEE, 2002, 3 (7): 1397~1402. 被引量:1
  • 9[9]Casamatta F. , Ciriot D. , 等 . Management of interruptible loads for power system security and operation, Power Engineering Society Summer Meeting,IEEE, 2002, 2 (7): 880~885. 被引量:1
  • 10[10]Ille M. Basic objectives of the ancillary markets and their valuation. Power Engineering Society Summer Meeting, IEEE, 2002, 3 (7): 1240~1241. 被引量:1

二级参考文献42

  • 1赵遵廉.电力系统运营系统[M].北京:中国电力出版社,2001.. 被引量:2
  • 2[1]Carlos S. Ancillary services: an overview[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 1/1-1/7. 被引量:1
  • 3[2]Lunn B R. Ancillary services in England and Wales[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 2/1-2/5. 被引量:1
  • 4[3]Fismen S A. Experience: Norway[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 4/1-4/6. 被引量:1
  • 5[4]Aguilera A. Procurement and remuneration of ancillary services in competitive environments: the example of Argentina and proposals for California[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 5/1-5/8. 被引量:1
  • 6[5]Singh H, Papalexopoulos A. Competitive procurement of ancillary services by an independent system operator [J]. IEEE Trans on PWRS, 1999, 14(2): 498-504. 被引量:1
  • 7[6]Lunn B R. Ancillary services-the Northern Ireland approach[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 3/1-3/5. 被引量:1
  • 8[7]Sandrin P. System services: several questions in an integrated utility perspective[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 7/1-7/5. 被引量:1
  • 9[8]Billinton R, Chowdhury N A. Operating reserve assessment in interconnected generating systems[J]. IEEE Trans on PWRS, 1988, 3(4): 1479-1487. 被引量:1
  • 10[9]Chowdhury N A, Billinton R. Assessment of spinning reserve in interconnected generation systems with export/import constraints[J]. IEEE Trans on PWRS, 1989, 4(3): 1102-1109. 被引量:1

共引文献113

同被引文献98

引证文献8

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部