期刊文献+

抽水蓄能电站在电网中的保安功能与效益分析 被引量:34

ANALYSIS OF SECURING FUNCTION AND ECONOMIC BENEFIT OF PUMPED STORAGE STATION IN POWER GRID
下载PDF
导出
摘要 抽水蓄能电站(PumpedStorageStation,PSS)既是负荷又是电源,运行灵活、启停方便,具有很好的黑启动能力,是电网安全防御的保安电源。文章分析了抽水蓄能电站在电网安全防御中的作用与经济效益,从受益体的角度分析了其动态效益,并结合我国的国情进一步探讨了抽水蓄能电站的效益补偿及运营模式,以期促进我国抽水蓄能电站的健康发展,保证电网的安全稳定运行。 In power grid the pumped storage station is both power source and power load. The pumped storage station is easy to start up and shut down, its operation modes can be flexibly changed. In view of its good blackstart ability, the pumped storage station can be used as the securing power source of a power grid. The securing function of pumped storage station and the economic benefit that can be brought about during the security defense of power grid are analyzed, in the viewpoint of beneficiary its dynamic economic effect is analyzed too. To improve the secure and stable operation of power grids, considering the actual condition of China the economic compensation and operation modes of pumped storage station are further researched to promote the healthy development of pumped storage stations in China.
出处 《电网技术》 EI CSCD 北大核心 2004年第20期54-57,67,共5页 Power System Technology
  • 相关文献

参考文献12

二级参考文献61

  • 1罗绍基.抽水蓄能电站的经济评价[J].水力发电,1995,22(8):1-10. 被引量:10
  • 2夏松雨.国外抽水蓄能电站的建设和经营情况[J].水力发电,1995,22(8):48-54. 被引量:5
  • 3徐得潜,韩志刚,翟国寿,刘新建,李世东.抽水蓄能电站与火电站配合运行优化模型研究[J].水力发电学报,1996,15(4):11-20. 被引量:16
  • 4徐得 刘新建 等.蓄能电站旋转备用效益的计算方法[J].水能技术经济,1993,2. 被引量:2
  • 5[1]Carlos S. Ancillary services: an overview[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 1/1-1/7. 被引量:1
  • 6[2]Lunn B R. Ancillary services in England and Wales[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 2/1-2/5. 被引量:1
  • 7[3]Fismen S A. Experience: Norway[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 4/1-4/6. 被引量:1
  • 8[4]Aguilera A. Procurement and remuneration of ancillary services in competitive environments: the example of Argentina and proposals for California[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 5/1-5/8. 被引量:1
  • 9[5]Singh H, Papalexopoulos A. Competitive procurement of ancillary services by an independent system operator [J]. IEEE Trans on PWRS, 1999, 14(2): 498-504. 被引量:1
  • 10[6]Lunn B R. Ancillary services-the Northern Ireland approach[C]. Proceedings of IEE Coloquium on Pricing of Ancillary Services. London: June 28, 1996. 3/1-3/5. 被引量:1

共引文献171

同被引文献325

引证文献34

二级引证文献264

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部