摘要
以"三边工程"施工特点为基础,探索和分析施工总承包在施工准备阶段将深化设计工作前移来辅助项目图纸设计。
Based on construction characteristics of "trilateral engineering",this paper analyzes drawing design of aided project by moved forward for detailed design in construction preparation stage for construction general contract.
出处
《施工技术》
CAS
北大核心
2017年第S2期1477-1479,共3页
Construction Technology
关键词
施工总承包
深化设计
图纸设计
建筑信息模型
医疗建筑
construction general contract
detailed design
drawing design
building information modeling(BIM)
medical building