三峡导流明渠截流与RCC围堰工程施工组织与管理 被引量:1

Construction Management of Third-Phase River Closure & RCC Cofferdam Works
下载PDF
导出
摘要 导流明渠截流和三期土石围堰、三期RCC围堰是保三峡工程初期蓄水的控制性关键工程,工期紧、强度高、技术复杂、施工组织与管理难度大。本文从导流明渠截流和RCC围堰施工准备、资源配置、生产与技术管理、质量安全控制等方面介绍其施工组织与管理过程。 The river closure on the open diversion channel, third-phase earth & rock cofferdams and RCC cofferdam are key control works for initial reservoir impoundment of the Three Gorges project, with tight construction schedule, high placement rates, knotty technical issues and big difficulties in construction. The construction mobilization and management, including preparation, disposition of resources, management of production and technology, control over quality and safety, etc. , are described in detail in this paper.
作者 张野 邢德勇
出处 《中国三峡建设》 2003年第5期11-12,22,共3页 China Three Gorges Construction
关键词 三峡工程 导流明渠 截流 RCC围堰 工程施工组织 river closure on open diversion channel RCC cofferdam construction arrangement management.
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部