导流明渠截流和三期土石围堰、三期RCC围堰是保三峡工程初期蓄水的控制性关键工程,工期紧、强度高、技术复杂、施工组织与管理难度大。本文从导流明渠截流和RCC围堰施工准备、资源配置、生产与技术管理、质量安全控制等方面介绍其施工组织与管理过程。
The river closure on the open diversion channel, third-phase earth & rock cofferdams and RCC cofferdam are key control works for initial reservoir impoundment of the Three Gorges project, with tight construction schedule, high placement rates, knotty technical issues and big difficulties in construction. The construction mobilization and management, including preparation, disposition of resources, management of production and technology, control over quality and safety, etc. , are described in detail in this paper.