期刊文献+

成套式模块栈桥技术经济性分析 被引量:3

Technical and Economic Analysis on Modular Conveyor Gallery
下载PDF
导出
摘要 针对传统设计中带式输送栈桥结构形式存在的高空作业时间长、施工周期长、施工对周边环境影响大等不足之处,介绍了成套式模块栈桥,并对成套式模块栈桥的技术经济性进行了详细阐述。与传统栈桥相比,模块栈桥按模数加工,现场直接组装,具有现场加工量小、标准化高、安装速度快、精度高、简洁美观等特点。 In view of the problems of long high-operation time,long construction period and large impact on the surrounding environment in the traditional design of belt-type corridor,the complete set of modular corridor is introduced,and its technical economy is elaborated.Compared with the traditional belt conveyor corridor,the module conveyor corridor is processed according to the modulus and directly assembled on site.It only requires small on-site processing,while provides high standardization,high installation speed and high precision,which is simple and artistic.
作者 郭庆华 张利 倪时华 GUO Qing-hua;ZHANG Li;NI Shi-hua(China Coal Construction and Installation Engineering Group Co.,Ltd.,Handan 056002,China)
出处 《煤炭工程》 北大核心 2019年第5期65-67,共3页 Coal Engineering
关键词 模块栈桥 技术经济性 结构形式 施工工期 modular trestle technical economy structural form construction period
  • 相关文献

参考文献9

二级参考文献26

共引文献27

同被引文献27

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部