沙坪煤业18204工作面末采及回撤工作的分析 被引量:1

Analysis of the end mining and retracement work in 18204 working face of Shaping Coal Mine
下载PDF
导出
摘要 沙坪煤矿按照年度工作计划在2012年2月中旬对18204综采工作面末采回撤工作进行了施工,以"安全、优质、快速、低耗"为工作目标,紧紧围绕着安全措施到位、技术指导到位、跟班组织到位、安全监督到位进行施工,并且按照计划圆满完成回撤工作。下面就18204综采工作面末采及回撤工作进行分析。 Shaping Coal Mine carried out construction work on the end of the 18204 fully mechanized mining face in midFebruary 2012 in accordance with the annual work plan,with the goal of'safety,high quality,fast and low consumption',closely surrounded the construction principal of'proper safety measures,proper technical guidance,proper follow-up organization,proper safety supervision',the retracement work was successfully completed according to the plan.The paper introduced the end mining and retracement work of 18204 fully mechanized mining face in detail.
作者 邬培民 WU Pei-min(Shanxi Jinshen Energy Co.,Ltd.,Hequ 036500,China)
出处 《煤炭工程》 北大核心 2018年第A01期85-87,共3页 Coal Engineering
关键词 回撤 末采 挂网 安全措施 retracement end mining hanging net safety
  • 相关文献

参考文献7

二级参考文献32

共引文献132

同被引文献13

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部