船舶建造生产计划优化问题模型研究 被引量:2

Research on ship-building production planning optimization model
下载PDF
导出
摘要 船舶建造生产计划是否合理对投资高、风险高、工期长的船舶制造业至关重要。本文研究现代造船模式下的船舶建造计划制定方法、船舶建造流程及仿真模型的建立和优化方法。通过实例仿真验证证明本文提出的仿真模型的正确性。该优化方法能有效降低船舶建造生产计划的总工期延误率。 Shipbuilding production plan is reasonable for high investment, high risk, long period of shipbuilding industry is crucial. This paper studies the modern shipbuilding mode of the construction process, expatiates the method of establishment of ship construction plan, and illustrates the method of establishing the simulation model, and put forward the optimization method of simulation model. Finally, the simulation results show that the simulation model is correct, and the optimization method can effectively reduce the total construction time delay rate.
作者 徐宁 申玫
出处 《舰船科学技术》 北大核心 2017年第3X期141-143,共3页 Ship Science and Technology
关键词 船舶建造 生产计划 仿真模型 优化方法 ship building production planning simulation model optimization method
  • 相关文献

参考文献4

  • 1李川..基于虚拟流水线的船舶制造生产调度与建模技术研究[D].上海交通大学,2008:
  • 2姚伟..仿真技术在船厂车间层生产计划调度中的应用研究[D].江苏科技大学,2012:
  • 3黄娟..船舶建造生产计划鲁棒优化调度研究[D].哈尔滨工业大学,2015:
  • 4黎南,薛敏,刘晓冰.基于RCPSP算法的船舶生产计划辅助生成系统[J].中国造船,2007,48(4):126-130. 被引量:4

二级参考文献8

  • 1崔敏.约束理论在现代航运企业中的应用[J].水运管理,2005,27(1):10-12. 被引量:2
  • 2温冬梅,李兴民.基于TOC理论的公共部门人力资源配置模型研究[J].邢台学院学报,2007,22(1):118-120. 被引量:3
  • 3MILES R E, SNOW C C. The new network firm:A spherical structure built on a human investment philosophy [J]. Organizational Dynamics, 1995, 24 (4):5-18. 被引量:1
  • 4SNOW C C, MILES R E, COLEMEN H J Jr. Managing 21st century network organizations[J]. Organizational Dynamics , 1992,20 (3) :5-20. 被引量:1
  • 5ACHROL R S. Changes in the theory of inter organizational relations in marketing: Toward a network paradigm[J]. Journal of the Academy of Marketing Science, 1997,25 (1);56-71. 被引量:1
  • 6BEDWORTH D D, BAILEY J E. Integrated Production Control System[M]. John Wiley & Sons, Inc. ,1982. 被引量:1
  • 7BLAZEWlCZ J J, LENSTEA J K,RINNOOY KAN A H G. Scheduling projects subject to resource constraints: classification and complexity[J].Discrete Applied Mathematics, 1983, 5 : 11-24. 被引量:1
  • 8MORTON T E,PENTICO D W. Heuristic Scheduling Systems[M]. John Wiley & Sons, Inc. ,1993. 被引量:1

共引文献3

同被引文献35

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部