期刊文献+

500kV安福站主变合环运行分析

Closed Loop Operation Analysis of 500kV Anfu Substation
下载PDF
导出
摘要 本文研究了枯水期三峡电厂各类运行方式下安福站合环运行的适应性,通过调整三峡开机等限制江陵站短路电流超标的控制策略,以及合理安排鄂西电网运行方式来避免安福站潮流上网和电磁环网带来的稳定风险,探讨了安福站主变合环条件。结果表明:合理安排安福站(季节性)运行方式将提升安福主变合环运行适应性,进一步提高鄂西电网枯水期间供电充裕性及可靠性。 In this paper,the adaptation level of Anfu substation closed loop operation under different operation modes of the Three Gorges power plant is studied.The short-circuit current of Jianglin substation is controlled by adjusting the the Three Gorges power operating plants,and unconscionable flow of Anfu substation is avoided by adjusting the operation mode of West Hubei power grid.The results show that reasonable arrangements of West Hubei power grid(seasonal)operation mode will enhance the adaptation level of Anfu station loop closing operation,which improves the power supply adequacy and reliability during the dry period.
出处 《湖北电力》 2015年第10期42-45,共4页 Hubei Electric Power
关键词 短路电流 运行方式 供电可靠性 开环运行 合环运行 short circuit current operation mode power supply reliability open loop operation closed loop operation
  • 相关文献

参考文献3

二级参考文献6

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;