摘要
根据碾压砼坝的施工特点 ,采用挖埋设再回填的方法 ,取得了内观仪器埋设的成功经验 .通过对几年来碗窑水库内观资料的分析 ,特别是温度及应力应变成果分析 ,为碗窑水库大坝安全监控提供了初始依据 .
According to the constructing characters of roller compacted concrete dam,the writer introduces the backfilling settlement of inner equipment.After several years'observation and analysis,specially in tenperature and stress,the writer think the contcucting method is reliable and safe.
出处
《浙江水利水电专科学校学报》
2002年第4期25-27,30,共4页
Journal of Zhejiang Water Conservancy and Hydropower College