摘要
介绍了龙滩水电工程右岸高边坡开挖中的爆破振动观测成果。爆破震动波在坡体上的传播规律与平地不同 ,衰减较慢。
Blasting vibration observation result of the right bank's high slope of Longtan Hydropower Project is introduced. The transmitting principle of blasting vibration wave on the slope is different from that on the flat ground, which decreases more slowly. As a result, the controlling point of blasting vibration must be set at the foot of the slope above the blasting source.