期刊文献+

浅谈土方工程中逆作法施工技术措施

Introduction to Uni-axial in Earthwork Construction Technical measures
原文传递
导出
摘要 随着中国经济的繁荣和发展,建筑行业如雨后春笋般发展起来,建筑形式和结构日益趋向复杂化,这就对施工技术提出了更高的要求。目前,高层建筑发展较快,有效地解决了城市建筑空间不足的问题。然而,在对高层建筑的地下室进行施工的时候,由于施工面积较小等原因,采用传统的正作法已经很难满足施工的要求,一定程度上影响了施工进程和施工效果。因此,逆作法施工应运而生。 With the prosperity and development of the economy in our country, the construction industry have sprung up, building forms and the increasingly complicated structure, it puts forward higher requirements for construction tech-nology. At present, the rapid development of high-rise buildings, effectively solve the problem of shortage of the ur-ban construction space. However, in the basement of high-rise building construction, due to reasons such as con-struction area is lesser, adopts the traditional practice is hard to meet the requirements of construction, to some extent affected the construction process and construction effect. Therefore, uni-axial arises at the historic moment.
作者 焦梅
出处 《工程经济》 2014年第4期46-49,共4页 ENGINEERING ECONOMY
关键词 土方工程 逆作法 原理及分类 施工技术措施 earthwork Uni-axial The principle and classification Construction technical measures
  • 相关文献

参考文献7

二级参考文献12

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部