溧高公路框架隧道关键施工技术研究

A study on the key construction technology for the framework tunnel of Ligao Highway
下载PDF
导出
摘要 溧高公路生态之旅框架隧道采用预应力钢筋混凝土框架现浇结构,通过控制墙身模板支撑体系和顶板模板支撑体系、钢筋、预应力张拉、压浆等,保证框架隧道施工质量,该成套工艺可为类似工程借鉴和推广应用。 The ecological journey frame tunnel of Ligao Highway adopts a prestressed reinforced concrete frame cast-in-place structure.By controlling the wall formwork support system and roof formwork support system,steel bars,prestressed tensioning,grouting,etc.,the construction quality of the frame tunnel is ensured.This complete set of technology can be used as a reference and promoted for similar projects.
作者 韩辉 吕泰达 王芮文 HAN Hui;LYU Taida;WANG Ruiwen(Engineering Department,Changzhou Transportation Construction Management Co.,Ltd.,Changzhou 213000,China;Intelligent Traffic Department,Huashe Design Group Co.,Ltd.,Nanjing 210000,China;Testing Center,Jiangsu Senmiao Engineering Quality Testing Co.,Ltd.,Zhenjiang 212028,China)
出处 《镇江高专学报》 2024年第4期79-83,共5页 Journal of Zhenjiang College
关键词 隧道工程 生态隧道 支架现浇 施工工艺 质量控制 tunnel engineering ecological tunnel support pouring construction techniques quality control
  • 相关文献

参考文献6

二级参考文献42

共引文献79

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部