摘要
钢结构屋盖在高铁站房中的应用逐渐增加,为进一步提高大型钢结构工程安装精度,确保站房建筑的稳定性和结构强度,论文以福建省莆田市高铁站房钢结构屋盖安装工程为例,深入分析了其日常监测、屋盖网架拼装、屋盖网架吊装、屋盖网架提升、网架合龙等施工环节中采取的安装精度控制措施。
In response to the continuous increasing of the application of steel structure roofs in high-speed railway station buildings,in order to further improve the accuracy of large-scale steel structure engineering installation,ensure the stability and structural strength of station buildings,this article takes the steel structure installation project of high-speed railway station buildings in Putian City,Fujian Province as an example,and analyzes in depth the installation engineering accuracy control measures taken in daily monitoring,roof grid lifting stage,grid closing stage and other construction stages.
作者
徐银
XU Yin(Zhejiang Southeast Space Frame Group Co.Ltd.,Hangzhou 311200,China)
出处
《工程建设与设计》
2024年第19期223-225,共3页
Construction & Design for Engineering
关键词
钢结构
安装
精度控制
steel structure
installation
precision control