摘要
云南富民、泸西、禄丰3座抽水蓄能电站是国家《抽水蓄能中长期发展规划(2021—2035年)》和《云南省抽水蓄能中长期规划》“十四五”重点实施项目,装机容量分别为1400、2100、1200 MW。水泵水轮机主要参数的合理选择是抽水蓄能电站安全投运及机组稳定运行的重要保障对富民、泸西、禄丰抽水蓄能电站可行性研究阶段水泵水轮机主要参数选择进行了介绍,为后续工作打下了良好的基础。
The three pumped storage power stations in Fumin,Luxi,and Lufeng are key implementation projects of the national"Medium-and Long Term Development Plan for Pumped Storage(2021-2035)"and the"14th Five Year Plan for Pumped Storage in Yunnan Province",with installed capacities of 1400,2100,and 1200 MW,respectively.The reasonable selection of the main parameters of the water pump turbine is an important guarantee for the safe operation of pumped storage power stations and the stable operation of the units.This paper introduces the main parameter selection of the pump turbine in the feasibility study stage of the Fumin,Luxi,and Lufeng pumped storage power stations,laying a good foundation for subsequent work.
作者
姚建国
王秀花
YAO Jianguo;WANG Xiuhua(Power China Kunming Engineering Corporation Limited,Kunming 650051,China;Faculty of Science,Kunming University of Science and Technology,Kunming 650500,China)
出处
《云南水力发电》
2024年第9期147-150,共4页
Yunnan Water Power
关键词
水泵水轮机
主要参数
富民抽水蓄能电站
泸西抽水蓄能电站
禄丰抽水蓄能电站
water pump turbine
main parameter
Fumin Pumped Storage Power Station
Luxi Pumped Storage Power Station
Lufeng Pumped Storage Power Station